Energoproekt Tower

Client: Energoproekt Tower
Year of execution: 2021
Client Field: Office building
Тotal cooling capacity: 955 kW
Types of products: Mitsubishi Heavy Industries VRF KXZЕ1 and RAC
Indoor units: 260 units for high wall installation and 18 Ceiling Cassette – 4way units
Outdoor units: 44 units

The Challenge

To implement a comprehensive heating, ventilation, and air conditioning project for a property undergoing a major renovation. The existing building was originally designed in 1964 for the needs of the engineering organization Energoproekt. It comprised a tall office building with a low single-story building, a basement level, and a tall 19-floor unit.

The solution

  • To ensure reliable heating and cooling throughout the building, a VRF system KXZE1 has been implemented. Each floor is equipped with a separate outdoor unit, installed on an outdoor platform.
  • Additionally, a specialized air conditioning unit has been installed in the server room on each level to provide the necessary cooling throughout the year.

The Result

The VRF system ensures low operating costs, high energy efficiency and the possibility of individual reporting of electricity consumption for each tenant. As a result, the building offers optimum comfort and sustainable management of energy resources.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam hendrerit nisi sed sollicitudin pellentesque. Nunc posuere purus rhoncus pulvinar aliquam. Ut aliquet tristique nisl vitae volutpat. Nulla aliquet porttitor venenatis.

Name Surname

Looking for a reliable partner for your air conditioning project, request a free consultation