
Copa Hydrosystem
Client: Copa Hydrosystem

The Challenge
Due to the heavy industrial activity at the enterprise, the machinery generates significant heat, causing temperatures in the production areas to rise considerably. Without adequate cooling, these temperatures can reach extreme levels of up to 60 degrees Celsius. To create a comfortable working environment for employees, it is essential to maintain a normal temperature. In 2014, the engineering team at Condex taken up this challenge by building a ventilation system equipped with ducted air conditioners. In 2022, as a satisfied customer, Copa Hydrosystem approached our team once again to address their air conditioning needs for a new production area in their expanding factory.

The solution
- To meet the working environment standards in the hydraulic components factory, our team designed and installed high-pressure duct air conditioners of the PAC series from the leading Japanese manufacturer Mitsubishi Heavy Industries.
- In addition, Condex engineers implemented a ventilation system with ceiling swirl diffusers.

The Result
The PAC series ducted air conditioners are designed to maintain optimal operating conditions, effectively heating and cooling rooms even with high ceilings. The air conditioning and ventilation solutions implemented ensure uniform air distribution and reliable performance for many years.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam hendrerit nisi sed sollicitudin pellentesque. Nunc posuere purus rhoncus pulvinar aliquam. Ut aliquet tristique nisl vitae volutpat. Nulla aliquet porttitor venenatis.



